I invite you to download a fully functional "All Steel" version of these Excel workbooks and use "Free of Charge" for 3 weeks. You can see for yourself, at no cost, how these spreadsheets work.

I have personally used this Excel workbook for 14 years. Compared to the old pencil and paper method I can now do in a couple hours what used to take all day and I end up with an automated record of all my calculations for every job I bid. Try this method, at no cost, and see for yourself how much simpler and faster estimating steel construction can be. The more familiar you become with the Excel functions the quicker your cost estimates will be.

You will enjoy the way your take-offs can be edited or tweaked or massaged again and again, as needed to generate a lump-sum-price that you are completely satisfied with. Also, see how these same take-off work-sheets become a perfectly accurate “Earned Values Management System” by simply marking any portion of your take-off as complete or a percent complete.

There are twelve versions of the "All Steel" trial version below. When you are ready for an Excel based steel construction cost estimating program just enter your e-mail address and click "Buy Now". Payments are made through PayPal; when your payment is confirmed you will recieve an e-mail that will contain a link for downloading your chosen Excel workbook. Once purchased the selected cost estimating program will function just like the Free Trial Version did except that there won't be an expiration date. Functionality will vary according to the parameters described for each version.

Purchase and download the spreadsheets and/or the FREE trial from a computer; the spreadsheets cannot be received by a mobile device.

FREE TRIAL OFFER
$ 0.00


Download Today!

Use, free of charge, for three weeks a series of fully functional EXCEL steel construction cost estimating spreadsheets. The file includes spreadsheets with built in formulas for estimating the cost of:
  • Structural steel erection
  • Misc steel installation activities
  • Steel decking installation
  • Steel siding installation
  • Rebar placement
  • Pre-engineered building erection/assembly
  • contract change orders
This EXCEL file contains these work specific spreadsheets all linked to a Bid Proposal that calculates a LUMP SUM price, a job specific daily log page, change order spreadsheets and a schedule of values that records the estimated direct cost, man hrs, values-as-earned and earned man hrs of each work-sheet priced.

Also included in this trial version is an accurate Earned Values Management System that calculates, for progress billing purposes, the project’s earnings. The same file used by the estimator to price a steel project, if successfully contracted, can be used to easily track the project’s earned values. This Excel file self-generates a Foreman's Checklist listing the estimator's piece counts, scheduled steel installation and work activities. The job-site foreman marks, on the checklist, the work as completed or the percent complete. The project manager can then update the estimator's take-off work-sheets by entering the information from this Checklist. Built in formulas calculate the values earned and the earned man hrs in the schedule of values progress billing statement.

At the end of the Free Trial Period this file will cease to function. You can purchased one of several versions of this EXCEL file, with varying functions, below.
 
All Steel BID with Earned Value Management System
$ 249.00
Email Address


PayPal - The safer, easier way to pay online!
This is a series of Excel steel construction cost estimating spreadsheets that function just like the free trial version did. The file includes spreadsheets with built in formulas for estimating the cost of:
  • Structural steel erection
  • Misc steel installation activities
  • Steel decking installation
  • Steel siding installation
  • Rebar placement
  • Pre-engineered building erection/assembly 
  • Contract change orders
     
This Excel file contains these work specific spreadsheets all linked to a Bid Proposal that calculates a LUMP SUM price, a job specific daily log page and a schedule of values that records the estimated direct costs, man hrs, values-as-earned and earned man hrs of each work-sheet priced.

Also included in this version is an accurate Earned Values Management System that calculates, for progress billing purposes, the project’s earnings. The same work-sheets used by the estimator to price a steel project, if successfully contracted, can then be used to easily track the project’s earned values.

This Excel file self-generates a Foreman's Checklist listing the estimator's piece counts, scheduled steel installation and work activities. The job-site foreman, weekly or monthly, marks on the checklist, the work as completed or the percent complete. The project manager can then update the estimator’s take-off work-sheets by entering the information from this Checklist, built in formulas calculate the values earned and the earned man hrs in the schedule of values.


 
All steel BID without Earned Value Management System
$ 149.00
Email Address


PayPal - The safer, easier way to pay online!
This version is a series of Excel steel construction cost estimating spreadsheets. The file includes spreadsheets with built in formulas for estimating the cost of:
  • Structural steel erection
  • Misc steel installation activities
  • Steel decking installation
  • Steel siding installation
  • Rebar placement
  • Pre-engineered building erection/assembly
  • Contract change orders
This Excel file contains these spreadsheets linked to a Bid Proposal that calculates a LUMP SUM price. This version includes the logged change order spreadsheets but does not include the Earned Values Management System that was in the Trial version.
 
All Steel Bid without C/Os
$ 99.00
Email Address


PayPal - The safer, easier way to pay online!
This version is a series of Excel steel construction cost estimating spreadsheets. The file includes spreadsheets with built in formulas for estimating the cost of:
  • Structural steel erection
  • Misc steel installation activities
  • Steel decking installation
  • Steel siding installation
  • Rebar placement
  • Pre-engineered building erection/assembly
This Excel file contains these spreadsheets linked to a Bid Proposal that calculates a LUMP SUM price. It does not include the Earned Values Management System or the logged change order spreadsheets that were in the Trial version.
 
Steel & Decking BID with Earned Value Management System
$ 199.00
Email Address


PayPal - The safer, easier way to pay online!
This version is a series of Excel steel construction cost estimating spreadsheets. The Excel file includes spreadsheets with built in formulas for estimating the cost of:
  • Structural steel erection
  • Misc steel installation activities
  • Steel decking installation
  • Contract change orders
This Excel file contains these work specific spreadsheets all linked to a Bid Proposal that calculates a LUMP SUM price, a job specific daily log page and a schedule of values that records the estimated direct cost, man hrs, values-as-earned and earned man hrs of each work-sheet priced.

Also included in this version is an accurate Earned Values Management System that calculates, for progress billing purposes, the project’s earnings. The same file used by the estimator to price a steel project, if successfully contracted, can be used by management to track the project’s earned values.

This Excel file self-generates a Foreman's Checklist listing the estimator's piece counts, scheduled steel installation and work activities. The job-site foreman marks, on the checklist, the work as completed or the percent complete. The project manager can then update the estimator’s take-off work-sheets by entering the information from this Checklist. Built in formulas calculate the values earned and the earned man hrs in the schedule of values.
 
Steel & Decking BID without Earned Value Management System
$ 99.00
Email Address


PayPal - The safer, easier way to pay online!
This version is a fully functional series of Excel steel construction cost estimating spreadsheets. The file includes spreadsheets with built in formulas for estimating the cost of:
  • Structural steel erection
  • Misc steel installation activities
  • Steel decking installation
  • Contract change orders
This Excel file contains these spreadsheets linked to a Bid Proposal that calculates a LUMP SUM price. This version includes the logged change order spreadsheets but does not include the Earned Values Management System that was in the Trial version.
 
Steel & Decking BID without C/Os
$ 74.00
Email Address


PayPal - The safer, easier way to pay online!
This version is a series of Excel steel construction cost estimating spreadsheets. The file includes spreadsheets with built in formulas for estimating the cost of:
  • Structural steel erection
  • Misc steel installation activities
  • Steel decking installation 
This Excel file contains these spreadsheets linked to a Bid Proposal that calculates a LUMP SUM price. It does not include the Earned Values Management System or the logged change order spreadsheets that were in the Trial version.
 
Pre-engineered BID with Earned Value Management System
$ 99.00
Email Address


PayPal - The safer, easier way to pay online!
This version is a series of Excel steel construction cost estimating spreadsheets. The Excel file includes spreadsheets with built in formulas for estimating the cost of:
  • Misc steel installation activities
  • Pre-engineered Building erection/assembly
  • Contract change orders
This Excel file contains these work specific spreadsheets all linked to a Bid Proposal that calculates a LUMP SUM price, a job specific daily log page and a schedule of values that records the estimated direct cost, man hrs, values-as-earned and earned man hrs of each work-sheet priced.

Also included in this version is an accurate Earned Values Management System that calculates, for progress billing purposes, the project’s earnings. The same file used by the estimator to price a steel project, if successfully contracted, can be used by management to track the project’s earned values.

This Excel file self-generates a Foreman's Checklist listing the estimator's piece counts, scheduled steel installation and work activities. The job-site foreman marks, on the checklist, the work as completed or the percent complete. The project manager can then update the estimator’s take-off work-sheets by entering the information from this Checklist. Built in formulas calculate the values earned and the earned man hrs in the schedule of values.

 
Pre-engineered BID without Earned Value Management System
$ 89.00
Email Address


PayPal - The safer, easier way to pay online!
This is a series of Excel steel construction cost estimating spreadsheets. The file includes spreadsheets with built in formulas for estimating the cost of:
  • Misc steel installation activities
  • Pre-engineered building erection/assembly
  • Contract change orders
This Excel file contains these spreadsheets linked to a Bid Proposal that calculates a LUMP SUM price. This version includes the logged change order spreadsheets but does not include the Earned Values Management System that was in the Trial version.
 
Pre-engineered BID without C/Os
$ 74.00
Email Address


PayPal - The safer, easier way to pay online!
This is a fully functional series of Excel steel construction cost estimating spreadsheets. The file includes spreadsheets with built in formulas for estimating the cost of:
  • Misc steel installation activities
  • Pre-engineered building erection/assembly 
This Excel file contains these spreadsheets linked to a Bid Proposal that calculates a LUMP SUM price. It does not include the Earned Values Management System or the logged change order spreadsheets that were in the Trial version.
 
Rebar BID with Earned Value Management System
$ 99.00
Email Address


PayPal - The safer, easier way to pay online!
This version is a series of Excel steel construction cost estimating spreadsheets. The Excel file includes spreadsheets with built in formulas for estimating the cost of:
  • Misc steel installation activities
  • Rebar placement
  • Contract change orders
This Excel file contains these work specific spreadsheets all linked to a Bid Proposal that calculates a LUMP SUM price, a job specific daily log page and a schedule of values that records the estimated direct cost, man hrs, values-as-earned and earned man hrs of each work-sheet priced.

Also included in this version is an accurate Earned Values Management System that calculates, for progress billing purposes, the project’s earnings. The same file used by the estimator to price a steel project, if successfully contracted, can be used by management to track the project’s earned values.

This Excel file self-generates a Foreman's Checklist listing the estimator's piece counts, scheduled steel installation and work activities. The job-site foreman marks, on the checklist, the work as completed or the percent complete. The project manager can then update the estimator’s take-off work-sheets by entering the information from this Checklist. Built in formulas calculate the values earned and the earned man hrs in the schedule of values.

 
Rebar BID without Earned Value Management System
$ 89.00
Email Address


PayPal - The safer, easier way to pay online!
This a series of Excel steel construction cost estimating spreadsheets. The file includes spreadsheets with built in formulas for estimating the cost of:
  • Misc steel installation activities
  • Rebar placement
  • Contract change orders
This Excel file contains these spreadsheets linked to a Bid Proposal that calculates a LUMP SUM price. This version includes the logged change order spreadsheets but does not include the Earned Values Management System that was in the Trial version.
 
Rebar BID without C/Os
$ 74.00
Email Address


PayPal - The safer, easier way to pay online!
This version series of Excel steel construction cost estimating spreadsheets. The file includes spreadsheets with built in formulas for estimating the cost of:
  • Misc steel installation activities
  • Rebar placement
This Excel file contains these spreadsheets linked to a Bid Proposal that calculates a LUMP SUM price. It does not include the Earned Values Management System or the logged change order spreadsheet that were in the Trial version.